The Berghof Solution in Detail
The compatibility of Berghof Automation systems allowed for an efficient replacement and conversion, reducing complexity and potential error-inducing procedures.
For the retrofit process, the original control wiring of the power plant was migrated to the new PLCs due to the compatibility of the Berghof equipment. This was an essential factor that facilitated a fast installation of the new system.
Even though the final control logic had several differences from the original, the compatibility between CODESYS V2.1 and CODESYS V3.5 allowed for an error-free transition. The functionality that needed to be migrated was easily updated to the CODESYS V3.5 platform. Most of the PLC program was tested in a laboratory environment before commissioning.
A major benefit of the retrofit was the ability to create an independent control system for all the generators, using the Berghof PLCs and HMI panels. Simultaneously, interconnection between all subsystems was easily set up using Ethernet communication. The Berghof PLC and the CODESYS V3.5 platform provided the required tools and communication protocols to integrate with all other components of the power plant's automation technology.
For all subsystems and control elements of the power plant, only the latest technology and components were used, such as the IEC 61850 norm for the electrical system, modern Woodward engine controllers and load-sharing equipment, and OPC UA for communication with the plant's SCADA system. The Berghof PLCs were easily integrated into this automation solution, providing all the necessary tools. The use of EtherCAT for remote IO modules and the processing power of the PLCs allowed for a faster and more manageable control strategy.